Stublach Substation
Our engineers designed and advised on the installation of a new electrical substation to provide 60MW of power for the new 400,000m³ natural gas storage facility at Stublach in Cheshire.
Our engineers designed and advised on the installation of a new electrical substation to provide 60MW of power for the new 400,000m³ natural gas storage facility at Stublach in Cheshire.
This scheme comprises four wind turbines positioned just behind the sea wall adjacent to the River Mersey.
Our provision of specialist technical advice was a key part of the installation of a new turbine generator for the black start power station at Barford in Cambridgeshire.
At Craigengelt we provided full design services for the access track to allow delivery of components for 8 wind turbines to the site.
Fyrish substation, located near Alness, is part of the Dounreay Beauly line upgrade, specifically designed to increase the level of renewable energy sources contributing to the national grid.
The Crossaig substation is required as part of the Kintyre to Hunterston Connection project.