Howdon


Posted on December 9th, 2015 at 9:00 PM


This project was to replace an old concrete plant on the eastern side of Newcastle, near to the Tyne Tunnel. This project required our input from the initial planning stages. We carried out a feasibility exercise looking at the influences of different plant systems and checked vehicle routes in and out of the site and how this would work in the space available. We also provided advice on ground improvement and designed foundations, pits and other substructures. Our final design included a surface water drainage system and water recycling as there were no permitted surface water discharges at the site.

Updated on January 4th, 2016 at 11:00 AM


Fact

Howdon Quarry is owned by Hope Construction ltd. Hope Construction are another long standing client who we maintain a very strong relationship with.