At Craigengelt we provided full design services for the access track to allow delivery of components for 8 wind turbines to the site. This required track alignment to a suitable geometry, modifications to existing roads, site entrance bellmouth design and culverting of stream crossings. The work also included design of a feed stream to a nearby fish farm. There were a number of difficult constraints at this site which we worked hard with the rest of the team to overcome